Events

Latest Event

Technical Webinar: The Crowchild Trail Bow River Bridge Project

Abstract The Crowchild Trail Bridge forms part of a six-lane major arterial corridor providing northbound and southbound service along Crowchild Trail over the Bow River, CPR right-of-way, and 10th Avenue SW in Calgary, Alberta. The 315m long bridge was constructed between 1965 and 1966. The City of Calgary had identified the need to rehabilitate the structure to extend its service life. At the same time, the City was undertaking the Crowchild Trail Corridor Study to review the functional needs of the

Register Now »

All Events